Engineering Metric: Use Commit Size to identify risky code
Engineering Metric: Use Commit Size to identify risky code
July 8, 2021

Along with Commit Frequency and Commit Volume, Commit Size is another useful (and basic) engineering metric in Allstacks...

Engineering Metrics: Commit Volume
Engineering Metrics: Commit Volume
January 10, 2018

The single most talked about developer metric is Lines of Code.  It’s been used since the early days of COBOL, and is st...

Engineering Metric: Don't Get Stuck, Get the Active Issue Metric!
Engineering Metric: Don't Get Stuck, Get the Active Issue Metric!
October 14, 2017

It’s inevitable. People get behind. As an engineering manager, one of your key jobs is ensuring that the development pip...